Plans and Specs are available for some of the following:

Bids: 

Ashfield- Apple Valley Bridge Replacement (Bill T)

Ashland-Pedestrian Bridge over Sudbury Inlet (Josh)

Athol-Crescent Street Bridge Replacement 

Barnstable-2019 Village Improvements (Josh)

Billerica-Fox Hill Cemetery Development (Josh)

Blackstone- Bridge Rehab over Blackstone Canal (Josh)

Carlisle-Greenough Dam Repairs (John)

Colrain-Adamsville Bridge Replacement (Bill V)

District 2- Drainage Repairs & Improvements (Bill V)

East Lyme, CT- Route 1 Bridge Replacement (Josh)

Monson-Detention Basin Project​

North Attleboro- Chestnut Street Bridge Replacement (John)

North Kingstown, RI- Quonset Apron Rehab (Bill V)

Princeton- Route 31 Culvert Replacement (Josh)

Providence-Canada Pond Dam Improvements (Josh)

Salem-Collins Cove Salt Marsh (John)​

Salem- Congress Street Pier Reconstruction (Bill V)

Sheffield-Berkshire School Rd Bridge Replacement (Bill T)

Washington-Middlefield Rd. Bridge Replacement (John)

Willington, CT-Rehab of I-84 Bridge over Lower Ruby (Bill T)

Projects:

Agawam/West Springfield- Bridge Replacement (Shawn)

Carver/Middleborough-Rochester Rd Bridge Repl. (Jim)

Framingham-Repl of the Beaver Street Bridge (Kurt)

Great Barrington-Downtown Area Roadway (Jay)

Housatonic Railroad Rehab of 4 Bridges (Dan)

Johnston, RI-Simmonsville Bridge Replacement (Shawn)

Lee- Chapel St Bridge Replacement (Dan)

Lee/Lenox-Bridge Repl. over Housatonic River (Steve)

Lenox/Pittsfield-Repair & Replace RR Bridges (Steve)

Orange, Ct-Operational Lanes (Dan)

Palmer- Rehab 3 Bridges along I-90 (Dan)

Salem-Forest River Seawall Repair (Eric)

Salem- Canal Street Rail Trail Phase 2 (Kurt)

Thomaston-Rehab of Bridges over Naugatuck River (Josh)

Stoneham/Winchester/Woburn- Bikeway & Ped. Bridge (Kurt)

Ware/Hardwick-Timber Bridge Repairs (Jay)

Winchendon-Bridge Replacement (Eric)

Worcester- Roadway Recon in Central Business District (Kurt)









Fax: 781-340-5708
This page was last updated: April 19, 2019